The soundboard was ready to go in almost a month ago but the weather did not cooperate with my schedule - there was a perfect weekend at the start of October, but I was away in Los Angeles and, by the time I got back, it had started raining an the relative humidity was up to 65% and the soundboard was showing some distinct curvature.
While I was waiting for the perfect day to glue in the soundboard I tried to finish up as many of the other small tasks as possible.
I varnished the legs:


and assembled several other parts:

The name board:

The jack rail:

and the music desk:

I also moved the case and the soundboard inside the house:

No comments:
Post a Comment